Insights / Commercial law

Breach of Contract: Assessing a Commercial Claim

A breach allegation is not yet a useful commercial claim. Before spending on correspondence, settlement or proceedings, identify the binding obligation, test the evidence of breach, build the loss counterfactual and ask what remedy would alter the business decision. A defined commercial barrister instruction can then answer a precise question rather than simply reviewing an unstructured bundle.

Define the help you need

Choose the right next step in a commercial contract dispute

Use this guide to turn an early breach allegation into a defined next decision. It helps a business choose whether to seek focused advice, commission drafting, explore settlement support, or involve a solicitor for litigation conduct.

Compare possible instructions for this issue

You need to decide whether the alleged breach supports a proportionate commercial response.

Possible instruction: Request focused advice on the disputed obligation, available evidence, loss analysis and practical options.

Prepare after initial checks: Identify the agreement version, disputed clause and commercial objective; keep the first enquiry to a short outline and any urgent date.

A question to raise: Can counsel advise on merits and remedies for this defined issue, and what information is needed after triage?

You have chosen a position but need it expressed clearly in correspondence or a draft pleading.

Possible instruction: Consider a defined drafting instruction for a response, settlement position or other agreed document.

Prepare after initial checks: Set out the desired outcome, key terms in dispute and any urgent date; do not send a full bundle at first enquiry.

A question to raise: Can a defined drafting task be quoted, and who will remain responsible for filing, service and administration?

The matter may need a hearing or a solicitor to manage the litigation process.

Possible instruction: Ask whether advocacy is suitable and arrange a solicitor separately if litigation conduct is required.

Prepare after initial checks: Give a short outline, identify the forum or process and urgent date, and say who is handling procedure.

A question to raise: Is separate solicitor support needed for litigation conduct, filing, service or deadline management?

Clarify before you enquire

  • Which contract version and disputed obligation are central to the decision?
  • What commercial outcome is needed: payment, continued performance, exit or settlement?
  • Which evidence and loss assumptions are most likely to change the decision?
  • Is there an urgent date, ADR step or forum issue to flag in a short outline?
  • Who will retain responsibility for procedure if a solicitor is needed?

These prompts are for your own preparation. Send only a short outline and any urgent date initially; do not send sensitive information or papers until suitable arrangements have been agreed.

General information, not a case assessment. Suitability, conflicts, availability and written terms must be agreed. An enquiry does not pause a deadline. Decision support added ; the legal article’s review and publication dates remain as stated below.

Updated

For Business owners, directors, in-house lawyers and commercial teams who need to assess an alleged breach, make a proportionate remedy or settlement decision, and commission defined advice, drafting or advocacy.

Jump to a section

The short answer

A sound breach-of-contract analysis is a chain: an enforceable obligation owed by the correct party; facts capable of proving non-performance; loss legally and factually connected to that breach; and a remedy worth pursuing after contractual limits, cost, time and route are considered. A conspicuous failure is not enough if the contractual term, causation or recoverable loss cannot be established.

  • Start with the operative agreement, its incorporated documents, amendments and notice provisions, not a later email summary.
  • Separate an accrued payment claim from a claim for loss. The calculation, evidence and defences may differ.
  • Test each head of loss against the world in which the obligation was performed, the available evidence, contractual caps or exclusions and any agreed damages clause.
  • Identify an arbitration, jurisdiction, escalation or ADR clause before assuming a court claim is the route.
  • Set a bounded question for counsel: for example, merits and remedies advice, a draft response, a settlement-position review or hearing advocacy. Do not ask counsel to take over unspecified litigation administration.

How should a contract breach be assessed?

1. Identify the obligation before describing the failure

Put the relevant version of the contract at the centre of the analysis. Record the parties’ full legal names and capacity, the clause or incorporated specification relied on, any condition precedent, the delivery or payment mechanism, variation and no-oral-modification wording, notice provisions and the governing-law and dispute-resolution clause. A purchase order, framework agreement, statement of work and standard terms may answer different parts of the question.

The practical question is not merely whether performance was disappointing. It is: what did this party undertake to do, by when, to what standard, and subject to what qualifications? A delivery date may be revised; an approval may be required; a service level may be measured over a period rather than on one event. Those details often decide whether the allegation is breach, delay attributable to the other side, a contractual adjustment, or neither.

For a court claim based on a written agreement, Practice Direction 16 says that a copy of the contract or documents constituting it should be attached to or served with the particulars of claim, with the original available at the hearing; incorporated general conditions should also be supplied, save for a sensible approach to bulky documents. An oral contract requires the words used and by whom, to whom, when and where they were spoken; a contract by conduct requires the conduct, actors, time and place. That procedural discipline is a useful early evidence test even before proceedings are contemplated. 7

2. Build a breach map, not a narrative

Create one row for each alleged obligation. State the clause, the agreed factual position, the evidence, the other side’s likely answer and the consequence said to follow. A dated chronology should cross-refer to the underlying document, not just reproduce allegations.

Useful evidence may include the executed contract and all versions, statements of work, change-control records, acceptance records, meeting minutes, project plans, invoices, delivery logs, quality reports, contemporaneous emails or messages, and the people who can explain them. Preserve native files and audit trails where they matter. A polished retrospective account is no substitute for a record showing what was communicated and when.

A defendant’s case should receive the same structure. It may say the obligation was varied, the claimant prevented performance, the specification was not met, a notice was defective, the claimant accepted the work, payment is subject to set-off, or the claimed consequence is outside the contract. The right response depends on the actual term and evidence, not on the label attached to the dispute. A disputed invoice may therefore require a different analysis; see unpaid commercial invoices.

3. Prove loss through a realistic counterfactual

For each claimed item, ask what financial position the claimant says it would have been in if the obligation had been performed, then compare that with the actual position. Link the difference to documents: a replacement purchase, a lost order, saved costs, finance records or a witness who can prove the relevant decision. A schedule should state the arithmetic, date range, assumptions and source material for every line.

Causation and mitigation are not exercises in asserting every adverse consequence after a breach. In Globalia Business Travel SAU v Fulton Shipping Inc (The New Flamenco) [2017] UKSC 43, the Supreme Court held that the relevant benefit must be caused by the breach or by successful mitigation; the issue is a sufficiently close causal link, not simply whether the breach gave the occasion for a commercial decision. On the facts, selling a vessel was an independent exercise of the owners’ proprietary choice, not mitigation of the lost charter income. The case is not a licence to ignore real savings or substitute revenue. It shows why a loss analysis must identify the particular interest injured and the legal, not merely chronological, connection between breach, response and benefit. 1 (paras 29–35)

Do not treat a forecast of lost profit as self-proving. The instruction should identify the source data, alternative causes, capacity constraints, actual customer decisions and costs that would have been incurred. A small, well-evidenced direct loss may be more valuable in decision-making than a large but speculative schedule.

4. Check contractual limits and the remedy sought

Read the entire remedies architecture together: payment terms, interest, service credits, liquidated damages, indemnities, exclusions, aggregate caps, sole-remedy language and any termination consequences. The words are not interchangeable, and a clause can change both valuation and leverage.

An agreed-damages clause should be analysed as drafted. In Cavendish Square Holding BV v Makdessi [2015] UKSC 67, the Supreme Court explained that the penalty rule concerns a secondary obligation which imposes a detriment out of all proportion to the innocent party’s legitimate interest in enforcing the primary obligation. It is not a general judicial review of the parties’ primary bargain, and compensation is not the only possible legitimate interest. A daily sum or forfeiture triggered by breach should therefore be read in its commercial setting before anyone assumes it is either automatically recoverable or automatically unenforceable. 2 (paras 31–35)

Interest needs similar care. In a County Court debt or damages claim, section 69 of the County Courts Act 1984 permits simple interest at a rate the court thinks fit or prescribed for the relevant period; the provision does not permit interest under it for a period during which interest on the debt already runs. The High Court equivalent is Senior Courts Act 1981, section 35A. Contractual interest, a statutory basis and court interest are different questions, so identify the pleaded basis and calculation. 3

The desired remedy should be explicit. It may be payment of a due sum, damages, a declaration, a negotiated variation or release, or a different contractual route. Where the High Court or Court of Appeal has jurisdiction to entertain an application for an injunction or specific performance, it may award damages in addition or instead under Senior Courts Act 1981, section 50. That statutory power does not mean such relief is suitable in every commercial dispute; the facts, contract, urgency and forum matter. 10

Which documents should reach counsel first?

A decision-ready brief is shorter than a data room but more useful than a bare allegation. It should contain:

  • the signed agreement and every incorporated term, schedule, change order and relevant notice;
  • a one- or two-page chronology with document references and an issues list separating admitted from disputed facts;
  • the correspondence most likely to prove performance, breach, variation, waiver, notice or causation;
  • a loss schedule with invoices, ledgers, replacement costs, forecasts and the assumptions behind them;
  • the commercial objective: payment, continued performance, a managed exit, settlement range, preservation of a relationship or a decision whether to pursue the claim;
  • any live deadline, ADR or escalation clause, arbitration agreement, court order, threat of insolvency action, limitation concern, or settlement communication; and
  • the question to be answered and the decision-maker authorised to give factual instructions and approve a settlement position.

Keep privileged legal advice and without-prejudice settlement material separately identified. Do not solve a document problem by sending every file. Explain what is missing and why it could matter.

How does procedure change the decision?

First establish the contractual forum. A commercial contract may require negotiation, expert determination or arbitration. Court procedure does not automatically govern a private process, and an arbitration clause should not be treated as a routine court-claim detail.

Where no approved pre-action protocol applies, the Practice Direction on Pre-Action Conduct and Protocols expects a proportionate exchange of information. Its objectives include understanding each side’s position, making decisions about how to proceed, attempting settlement, considering ADR, supporting efficient management and reducing costs. A claimant’s usual letter should give concise details of the basis, facts, remedy and money calculation; the recipient should identify whether the claim is accepted, what is disputed and any counterclaim. Key documents should be disclosed. 5 (paras 3–6)

This is not an invitation to create a trial bundle before a decision is made. The Practice Direction expressly requires reasonable and proportionate steps. It says that failure to comply can affect case management and costs, including a stay or cost and interest consequences, while minor technical infringements are unlikely to be decisive. 5 (paras 4–5, 13–16)

If proceedings are needed, they are started when the court issues a claim form at the claimant’s request under CPR 7.2. CPR 16.4 requires a concise statement of the facts relied on; where interest is sought, it requires the basis and specified calculation details. These are reasons to decide the claim theory and remedy before filing, not reasons to file prematurely. 8 (r 7.2) 6 (r 16.4)

Limitation should be checked before negotiations begin. Section 5 of the Limitation Act 1980 states that an action founded on simple contract must not be brought after six years from accrual of the cause of action. The date of accrual, a deed, a contractual time bar, concealment, acknowledgments, the relief claimed and service may raise different issues. The Pre-Action Conduct Practice Direction itself does not alter statutory time limits. For a focused deadline assessment, see commercial limitation and contractual time bars. 9 (para 17)

Worked hypothetical: the delayed logistics launch

Example only. A retailer engages a logistics provider under a master services agreement and statement of work. The retailer withholds the final £75,000 invoice, saying that a new fulfilment service missed a 1 May launch and caused lost sales. The provider says the retailer did not supply product data until 7 May. The contract contains a £2,000-per-day delay clause, an aggregate cap and an exclusion for specified categories of loss.

A useful defined instruction is not: take over the dispute. It is: advise on the construction and effect of the delivery, data-dependency, agreed-damages, cap and exclusion clauses; assess the prospects of the invoice and counterclaim; identify the evidence needed to prove or resist loss; and settle a without-prejudice or open response if appropriate.

The material would include the executed agreement, statement of work, project plan, data-transfer records, the daily delay clause, acceptance criteria, launch communications, the £75,000 invoice, retailer sales data, internal capacity records and the correspondence about the revised date. The advice would test whether the provider’s alleged delay was contractually attributable, whether the daily sum is engaged and how Cavendish applies to this clause, whether the lost-sales case can survive the exclusion and cap, and what payment or set-off case is actually available. No conclusion follows from the figures alone.

If the retailer instead wishes to end the relationship, termination is a separate decision with its own notice, election and wrongful-termination risks. See terminating a commercial contract safely, rather than treating a damages analysis as a termination notice.

What does a defined commercial barrister instruction look like?

For a suitable matter, Keane may consider defined advice, drafting and appropriate advocacy, subject to competence, conflicts, suitability and availability. He is a self-employed Public Access barrister and is not authorised to conduct litigation. The client or an authorised solicitor remains responsible for filing, service, litigation administration and deadlines.

A defined instruction might ask for a written merits and remedies opinion on identified issues, a conference to test the loss model and settlement options, a draft letter of response or a draft pleading, or advocacy at an appropriate hearing. It should state what is outside scope. An enquiry does not pause time or create an accepted instruction.

For an in-house legal team, give counsel a clear division of work: name the legal lead, factual owner, finance contact, settlement approver and procedural owner. Ask the commercial team to validate the counterfactual and source documents; ask finance to reconcile the schedule; and ask the lawyer managing the matter to identify privilege, the forum and the live procedural dates. A solicitor can handle issue, service and the wider conduct of litigation where those functions are required. The companion guide on briefing a commercial barrister alongside an in-house team addresses that hand-off in more detail.

Before work begins, a suitable instruction proceeds only under a written scope, a fixed-fee quote plus VAT, signed terms and payment through chambers-verified details. Current service information is available on the fees page. For broader service context, see commercial law and Public Access.

Frequently asked questions

Is a clear breach enough to recover the whole claimed amount?

No. The claimant must still establish the particular obligation, breach and recoverable consequence. The loss schedule must address the relevant counterfactual, contractual limits and benefits or savings with the necessary causal connection. Globalia illustrates why a commercial event following breach is not automatically a credit or a recoverable loss. 1 (paras 29–35)

Can a business claim lost profits?

Lost-profit allegations need a clause-by-clause and evidence-led assessment. The claimant should identify the affected revenue, costs that would have been incurred, other causes and the evidence for the counterfactual. Any exclusion, cap, agreed-damages provision or other remedy term may change the result. Do not assume a forecast, a customer complaint or a headline sales figure proves the legal measure of loss.

Is an agreed damages amount enforceable because both parties signed it?

Signature matters, but it is not the only question. The clause must first be construed in context. If the penalty rule is engaged, Cavendish asks whether a secondary obligation imposes a detriment out of all proportion to the innocent party’s legitimate interest in enforcing the primary obligation. The result is fact- and clause-specific. 2 (paras 31–35)

Do negotiations, a pre-action letter or an enquiry to counsel stop limitation?

Not ordinarily. The general pre-action Practice Direction expressly says it does not alter statutory time limits, and proceedings are started only when the court issues the claim form under CPR 7.2. A simple-contract claim is commonly subject to section 5 of the Limitation Act 1980, but the accrual date and any different time bar must be checked on the actual facts. 5 (para 17) 8 (r 7.2) 9

Can a commercial barrister file and serve the claim for me?

Keane is not authorised to conduct litigation. He may consider the defined advice, drafting or advocacy work agreed in writing, but filing, service, general case administration and deadline management are for the client or an authorised solicitor. If the matter needs a professional to conduct litigation, that should be arranged separately.

Next step

If the decision is whether there is a viable breach claim, a focused instruction should identify the contract, the disputed obligation, the desired commercial outcome, the latest safe date, the key papers and the task requested. Use the commercial enquiry form with a short outline. Do not send a sensitive or extensive bundle at the first enquiry. Suitability, scope, conflicts, fee and procedural responsibility need to be agreed before work is accepted.

Scope, jurisdiction and currency

This article concerns commercial contract disputes under the law of England and Wales and court procedure where that route is available. It is current as at 28 October 2026. It does not determine the meaning of any particular contract, the correct forum, a limitation date, the effect of a foreign-law or arbitration clause, or the merits of an individual dispute. Statutes, CPR materials, practice directions and case law can change.

Sources

Your next step

Start with a short outline.

Read how direct instruction works. An enquiry does not pause a deadline or create an accepted instruction.

How to enquire

Related reading